| |
 KDW provided an extensive building addition and interior
refurbishment of this church’s main Fellowship Hall, along
with a second floor classroom/office addition and a variety
of related building improvements.
On the first floor, improvements included a new kitchen
and entry lobby, a new elevator, and two new interior
stairways. The existing Fellowship Hall on this floor was
completely refurbished with new paint, flooring, ceilings
and lighting, and a new roof was installed over this area
and an existing classroom wing.
On the new second floor addition, a new pastor’s office
was designed with a private bathroom, adjacent to several
classrooms with vaulted ceilings and new toilet rooms. The
classrooms were designed with dividable partitions for
maximum flexibility--when opened to their fullest, these
partitions create a large conference room for larger
audiences and gatherings. A new mechanical system was
installed to support the building addition and Fellowship
Hall.
Outside, a new arcade canopy entry and covered walk
provides cover for barbecues and other outdoor gatherings at
the front of the building, and the entire structure was
given new exterior facade upgrade.
|


 |