This church expansion entailed an approximately 900 sf,
two-story infill between two existing structures, resulting
in a new skylit entry, complete with a new four-stop
elevator and stair lobby.
The scope of construction involved demolition of existing
roofing, drainage, lower level entry, stairs, and south
wall, along with excavation around existing foundations,
replacement of existing windows, and the installation of
temporary and permanent drainage systems.
New amenities included a machine room, mechanical heat
and ventilation, electrical upgrades, and seismic separation
from the adjacent structures. In order to accommodate
occupancy during construction, the existing educational
building’s stairway and south wall were replaced first to
provide access while the remainder of the facility was
constructed. |


 |