Main Campus Data Center Renovation
University of Washington
Seattle, Washington
Classroom Addition
Seattle Full Gospel Church
Des Moines, Washington
Lapwai High School Additions &
Renovations
Lapwai, Idaho
Atmospheric Science Building HVAC Upgrades
University of Washington
Seattle, Washington
As a consultant to an electrical engineering company, KDW
assisted in the placement of new HVAC condenser units on the
roof of the Atmospheric Science Building. Our scope entailed
the design of a mechanical equipment platform and roof
penetrations within an existing skylight.
Brooklane Early Childhood Learning Center
Central Washington University
Ellensburg, Washington
Brooklane Early Childhood Learning Center serves the
children of married on-campus students by providing
education, daycare, and recreation facilities. This project
involved 4,500 sf interior reconfiguration and renovation,
along with a 1,500 sf addition to increase the size of three
existing classrooms and expand the kitchen. All finishes
were upgraded, and restrooms were reworked to accommodate
the associated mechanical systems upgrade.
Johnson Quaternary Research Center Renovations
University of Washington
Seattle, Washington
The Quaternary Research Center (QRC) is focused on the
study of the earth’s environment over the last two million
years, involving severe climactic changes such as deep
freeze conditions. KDW is assisting in a highly sensitive
refurbishment of a 32-year old, 1,400 square foot, -40
degree freezer serving the QRC’s research efforts, involving
mechanical/electrical systems in two sections of the
freezer, and replacement of all components and sytems in
three other sections of the freezer. Remodels to the
surrounding 2,880 sf research laboratories require
specialized insulation to prevent condensation between the
extreme temperature differences surrounding the freezer.
Engineering Technology Building Utility Upgrade
Western Washington University
Bellingham, Washington
Working in conjunction with Coffman Engineers, KDW was
responsible for an upgrade to all mechanical and electrical
systems servicing the engineering technology teaching
facility.
Kitchen Ventilation Upgrades
Meridian Junior High School
Kent, Washington
KDW assisted Tres West Engineering in the addition of
ventilating equipment to the rooftop over the kitchen.
Chilled Water Piping Replacement
Sequoia Middle School
Kent, Washington KDW assisted Tres West Engineers with the
replacement of the existing chilled water piping at this
school. Main Campus Cable Extension
University of Washington
Seattle, Washington
KDW assisted an electrical engineering firm in the design
of a new 1000-foot electrical duct bank, installed in a
manner which would enable the duct to function as a
sidewalk, due to the poor soils conditions in the area.
Burke Museum HVAC Units
University of Washington
Seattle, Washington
KDW worked with an electrical engineering firm in the
installation of new HVAC condenser units on the roof of the
Burke Museum. Work included the design of a mechanical
equipment platform and details for roof penetrations.
|