This one-story 13,000 sf facility provides the primary
HVAC systems for three buildings, along with augmentation
and back-up HVAC for six additional multi-story buildings.
Included in the structure are four 1000-ton chillers, one
350-ton chiller, 18 pumps, and two nominal 2,200-ton cooling
towers. To reduce the overall visible “bulk” of the
structure, the facility was designed partly into a hillside,
with roof-top parking and masonry details to complement
adjacent building architecture. The project was completed
within seven months at a construction cost of $7.4 million.
|



|